Project Gallery

We take pride in every project we build. Day or night, at many locations throughout the state, our people are proud to safely build our communities.

The project included repairs to the longitudinal and transverse joints prior to paving along with milling 1.5Ó of the existing asphalt and replacing it with new HMA.

Cadillac accomplished the paving by utilizing a 24Õ paver screed which eliminated several miles of cold longitudinal joints. Cadillac received a Quality in Construction Award from the National Asphalt Pavement Association for their work on Grand River Ave. (M-5)

Services

  • Road & Highway Paving